Education & Health- Examples of our work

Project:

Belper School Sixth Form Extension, Derbyshire

Scope:

The project involved the construction of a new first floor teaching level. The works comprised the installation of new foundations to receive new steel framework, structural alterations to the ground floor to allow for proposed ground floor layout and ground to first floor staircase, erection of new steel framework inclusive of new external columns, new flooring and new roofing structures, new windows, associated M+E, installation of new timber rainscreen cladding and solar panels to the roof.

 

Project:

Castle Donington College, Castle Donington

Scope:

The project involved a single storey extension at the college for client East Midlands Education Trust. The project involved the infilling of an outdoor swimming pool and the construction of a new science laboratory block with toilet facilities. The project was subject to relentless wet weather which presented the site team with some challenges along the way! The works briefly comprised the infill of swimming pool, new foundations, new blockwork and brickwork walls, new flat roofing with skylights, new M+E, new floorings, new toilet facilities and new science lab fit out.

Project:

JTL Develop Training Centre, Ascot Drive, Derby

Scope:

The project involved structural alterations to the ground floor to create a new open plan reception/seating area and alterations to the first floor to create an improved teaching space layout. The flat roofing finishes to the front of the building were replaced, a new entrance area to the left of the building was formed and new windows installed to give the building a more welcoming and fresh new look. The refurbishment also included asbestos removals, M+E, the installation of new lighting, new flooring finishes and decorations throughout to all teaching rooms.

Project:
SMB College Group, Melton Campus, Melton Mowbray

Scope of Works:
The project involved the conversion of multiple classrooms into a mock hospital ward for the students which involved the demolition of existing walls to create a larger teaching area, new lighting, new ceilings, M+E installations and new flooring finishes.

Project:

NHS Horizon Healthcare, Derby

Scope:

The project involved a full ground floor refurbishment of the health care facility to the client's specification.

Project:
​NHS Friar Gate Surgery, Agard Street, Derby​

Scope:
Refurbishment of existing healthcare facility.

Project:
SMB College Group, Stephenson College, Coalville

Scope of Works:
The project involved the demolition of multiple walls to convert several classrooms into a large plumbing workshop made up of multiple plumbing pods. The works involved the strip out of the existing classroom spaces including services, the demolition of multiple walls, formation of new plumbing pods, M+E installations and new flooring.